| Project Documents/Presentations |
|
This presentation was given by the National Park Service during the December 9, 2004 public meeting held in Flagstaff Arizona. The presentation discusses regional haze issues associated with power plants within the Four Corners Region (i.e., Arizona, New Mexico, Utah, and Colorado). Note, this presentation is a 10.9 MB Power Point file and will take considerable time to load over a dial-up connection.
|
||||||||||||||||||||||||||||||||
|
This presentation was given at the Federal Scoping Meetings December 2004. Note, this presentation is a 5.5 MB Power Point file and will take considerable time to load over a dial-up connection.
|
||||||||||||||||||||||||||||||||
|
The Final Scoping Report (July 2005): Note, these files are large and will take considerable time to load over a dial-up connection. Scoping Report Main Text (size 9.8 MB) Appendices (size 7.9 MB) Navajo Announcement Files (1.7 MB) |
||||||||||||||||||||||||||||||||
|
The Draft EIS: Note, these files are large and will take considerable time to load over a dial-up connection. Cover Page (size 10.0 MB) Dear Reader, Title Page, Abstract (size 3.3 MB) Table of Contents (size 0.1 MB) Executive Summary (size 2.3 MB) Chapter 1 - Introduction (size 0.9 MB) Chapter 2 - Alternatives (size 3.2 MB) Chapter 3 - Affected Environment (6.1 MB) Chapter 4 - Environmental Consequences (2.9 MB) Chapter 5 - Cumulative Impacts, Unavoidable Adverse Effects, and Irreversible and Irretrievable Commitment of Resources (0.9 MB) Chapter 6 - Consultation and Coordination(0.7 MB) Chapter 7 - References (0.6 MB) Index (size 0.5 MB) Glossary (size 0.6 MB) Appendix Cover Sheet (10.4 MB) List of Appendices (0.01 MB) Appendix A - Finding of No Significant Impact – Navajo Mine (No. NM-0003F) (0.9 MB) Appendix B - Well Impact Studies – 2005, 2006, and 2007 (129.0 MB) Appendix C - Construction Activities for Transmission Lines (0.5 MB) Appendix D - Navajo Mine Extension Project: Background Information and Preliminary Mine Plans (0.7 MB) Appendix E - Waters of the U.S. Mapping Report (47.4 MB) Appendix F - Water Quality Data (0.6 MB) Appendix G - Biological Assessment and Biological Evaluation (5.3 MB) Appendix H - Navajo Nation Department of Fish and Wildlife - Description of Wildlife Areas (0.5 MB) Appendix I - National Renewable Energy Laboratory Exhibits (6.0 MB) Appendix J - Risk Analysis (4.8 MB) Appendix K - Air Quality Technical Information (1.0 MB) Appendix L - Public Involvement Activities (0.5 MB) Appendix M - Notices of Intent (0.6 MB) Note: Updated versions of the Executive Summary, Appendix F and Appendix J were placed on the page on May 22 Hard copies of the Draft EIS are available for public review at the following locations:
|
||||||||||||||||||||||||||||||||